Our client contacted us as they were unhappy with their installation and design carried out by a nationwide solar PV company.
They had a solar only system with no battery storage and this made it difficult to take full advantage of their solar panels.
We ripped out the old standard inverter and fitted a new 5kw Hybrid inverter with 11.4 KW of battery storage after getting approval from the supply network in their area.
The battery system ensures that they maximise production from their solar panels.
As additional works we also installed a number of EPS (emergency power supply) circuits to keep our clients internet and freezers running in the event of a power cut on the grid.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |